Block Core Fill Calculator

Grout or concrete to fill concrete block cores, in cubic yards and 80 lb bags.

Project Details
Enter your measurements and requirements
Results
Calculated estimates for your project
Blocks in the wall360
Cores to fill60 (12 courses)
Fill volume3.81 cu yd
80 lb bags172

Turn these numbers into a build plan.

  • 60 cores
  • 3.81 cu yd fill
  • $1,204 est. cost
Materials List
Recommended materials and quantities
Core fill grout or 80 lb premix172 bags or 3.81 cu yd

Show your build

Finished the block core fill? Snap a before and after. The photo maker lines them up into one image you can post, and a free Blueprint account keeps the photos with your measurements and materials.

Project plan · built from your numbers

Grout 60 block cores

Fill 60 cores in a 40 ft wall with 3.81 cubic yards of grout.

Materials
$1,204
Time
2 days
Level
Intermediate
6 steps 5 tools 2 materials
  1. 1

    Confirm the wall design

    Check reinforcing layout and permits with your building department before you pour.

    • Layout confirmed
  2. 2

    Clean the cores

    Remove mortar droppings and debris from every core.

    • Cores clear
  3. 3

    Set the rebar

    Place and tie any vertical bars and block cleanouts.

    • Bars plumb
01 · Your numbers
Cores
60
Fill
3.81 cu yd
Est. cost
$1,204
02 · The plan

6 steps · 5 tools · 2 materials

3 more steps, the full tool list and a shopping list you can check off as you go.

03 · Finished

Your plan is 60% built. Save it.

3/5

Grout 60 block cores

Finished in 2 days · $1,204 DIY

Built for your cores of 60. Your first plan saves free. No card needed.

Or save it with just your email

We send a link; open it and this plan is your first project. Your first plan saves free. No card needed.

Borrow these 5 tools from neighbors

How to calculate concrete block core fill

A standard 16 in block has two cores. Core volume depends on block width.

  1. Count courses. Divide wall height in inches by 8.
  2. Count cores. Two per block, or only the cores on your reinforcing spacing.
  3. Multiply by the void. Multiply cores by courses by the volume of one core.
  4. Convert. Divide cubic feet by 27 for yards, or by 0.6 for 80 lb bags.
  5. Add waste. Add 10% for grout that runs into voids and joints.

Core fill per 100 sq ft of wall

Block widthVoid per blockCubic yards per 100 sq ft
6 in0.17 cu ft0.71
8 in0.26 cu ft1.08
10 in0.35 cu ft1.46
12 in0.46 cu ft1.92

Void figures are typical and vary by block. Size the wall with the masonry estimator. Structural walls need a design from an engineer or your local prescriptive code.

Frequently asked questions

How much concrete fills a block?

An 8 in block holds about 0.26 cu ft across both cores, so roughly 100 blocks take about 1 cubic yard.

Should I use grout or concrete?

Use coarse or fine masonry grout, or a high-slump pea gravel mix. Regular concrete with large stone bridges in narrow cores.

Do all cores need filling?

Often only cores with rebar are filled. Below-grade and retaining walls may need more, so follow the design for your wall.

How high can I pour at once?

Lift limits depend on the grout and code. Consolidate each lift by rodding or vibrating so no voids remain.

Why is my real number higher?

Grout runs into hollow spaces at webs and joints. Keep the 10% allowance and have an extra few bags on hand.