Metal Roofing Calculator

Panel count, cut length, trim and fasteners for exposed-fastener or standing seam panels.

Project Details
Enter your measurements and requirements
$
Results
Calculated estimates for your project
Roof area1073 sq ft (10.7 squares)
Panels30
Panel cut length163" (13.58 ft)
Ridge / eave / rake trim, 10.5 ft4 / 8 / 6
Screws859
Panel cost$3,362

Turn these numbers into a build plan.

  • 30 panels
  • 163 in length
  • $3,362 est. cost
Materials List
Recommended materials and quantities
Metal panels at 163"30
Metal roofing screws859

Show your build

Finished the metal roofing? Snap a before and after. The photo maker lines them up into one image you can post, and a free Blueprint account keeps the photos with your measurements and materials.

Project plan · built from your numbers

Metal roof, 10.7 squares

30 panels cut to 163 in with ridge, eave and rake trim for a 1,073 sq ft roof.

Materials
$3,362
Time
1 weekend
Level
Advanced
6 steps 5 tools 6 materials
  1. 1

    Confirm permit and panel limits

    Check permit needs with your building department and the panel's minimum pitch.

    • Permit question answered
    • Minimum pitch checked
  2. 2

    Prepare the deck

    Repair the deck and lay synthetic underlayment.

    • Deck solid
    • Underlayment on
  3. 3

    Install eave trim

    Fasten eave trim straight and level to a chalk line.

    • Trim straight
01 · Your numbers
Panels
30
Length
163 in
Est. cost
$3,362
02 · The plan

6 steps · 5 tools · 6 materials

3 more steps, the full tool list and a shopping list you can check off as you go.

03 · Finished

Your plan is 60% built. Save it.

3/5

Metal roof, 10.7 squares

Finished in 1 weekend · $3,362 DIY

Built for your panels of 30. Your first plan saves free. No card needed.

Or save it with just your email

We send a link; open it and this plan is your first project. Your first plan saves free. No card needed.

Borrow these 5 tools from neighbors

How to calculate metal roofing panels

Panels run from eave to ridge, so count them across the eave and cut them to the slope length.

  1. Measure the eave. Measure the eave length of each roof plane.
  2. Count panels. Divide the eave in inches by the panel's coverage width and round up.
  3. Find the length. Multiply the run by the pitch factor and add 1-1/2 in of overhang.
  4. Add trim. Divide ridge, eave and rake lengths by a 10 ft usable stick.
  5. Count fasteners. About 80 screws per square for exposed fastener, or one clip every 2 ft along each seam.

Common panel types

PanelCoverageTypical minimum pitch
Exposed fastener, 36" coverage36 in3:12
PBR, 36" coverage36 in1:12
Standing seam, 16" coverage16 in2:12
Standing seam, 12" coverage12 in2:12

Compare against shingles with the roofing calculator, and check snow load in cold climates.

Frequently asked questions

How many metal panels do I need?

Divide the eave length in inches by the panel coverage and round up. A 40 ft eave with 36 in panels needs 14 per side.

What is the minimum pitch for a metal roof?

Exposed-fastener panels usually need 3:12 and standing seam 2:12 or lower with the right seam. The panel maker sets the actual limit.

How many screws per square?

About 80 for exposed-fastener panels, depending on purlin spacing. Follow the fastening pattern from the panel maker.

Can metal go over shingles?

Often yes with one layer of shingles and the right underlayment, but local code and warranties decide. Ask your building department.

How long should panels overhang the eave?

About 1 to 1-1/2 in past the drip edge, so water clears the fascia.